Skip to main content

CARGO RATES

A. Dockage Charges. (§III.13). Rate per day, by length.

1. 000.00 – 351.05 ft - $2,124.05

2. 351.05 – 371.02 ft - $2,339.45

3. 371.02 – 400.26 ft - $2,586.15

4. 400.26 – 426.51 ft - $2,876

5. 426.51 – 449.48 ft - $3,097.85

6. 449.48 – 475.72 f - $3,399.45

7. 475.72 – 498.69 ft - $3,864.20

8. 498.69 – 524.93 ft - $4,604.35

9. 524.93 – 551.18 ft - $4,750.55

10. 551.18 – 574.15 ft - $4,989.50

11. 574.15 – 600.39 ft - $5,708.75

12. 600.39 – 626.64 ft - $6,647.40

13. 626.64 – 649.99 ft - $7,554.65

14. Above 650 ft., added on top of above rate, per ft - $11.70

B. Wharfage Assessment. (§III.6). - $13.06

Minimum charge for any single bill of lading

C. Service and Facility Charges. (§III.2). Per 1000 board feet, unless noted

1. Logs. Scribner scale, ex dock - $10.15

2. Cants. - $7.87

3. Lumber. Packaged rough. - $6.82

4. Lumber. Packaged surfaced - $6.06

5. Plywood, Veneer, corestock & hardboard, /1000 kilos - $7.70

6. Pulp, Linerboard, bales or rolls, 2000 kilos - $4.61

7. Break bulk power and energy components, per metric ton - $12.00

8 Other commodities, per metric ton or 1000 bf - $8.92

9. Other commodities, per cubic meter - $7.46

D. Wharf Charges. (§III.7). Per 1000 board feet, unless noted.

In addition to Service and Facility Charges.

Logs. Scribner scale, ex dock - $12.42

Cants - $7.87

Lumber. Packaged rough - $5.95

Lumber. Packaged surfaced - $5.31

Plywood, Veneer, corestock and hardboard, per 1000 kilos - $5.19

Pulp, Linerboard, bales or rolls - $3.56

Wind and wave energy components, per metric ton - $14.00

Other commodities, per 1000 kilos - $7.29

Other commodities, per cubic meter - $6.01

E. Cargo Staging Area. (§IV.2). Base rent for surge area.

1. per week, seven days - $2,610.95

2. per day, less than seven days - $391.70

F. Line Service. (§V.3).

The Port of Newport has contracted with Pasha Stevedoring to provide line service at the terminal. Those not exempted from lines service at the terminal are required to contact Pasha Stevedoring to arrange lines service, and to attain quotes. Rate schedule per hour, minimum 2 hours required.

1. 2 men - $547.40 

2. 4 men - $921.73

3. 6 men - $1,295.48

4. 8 men - $1,669.23

G. Labor 

Users of the terminal will be directed to stevedoring services for labor needs that are above and beyond the Port’s currently assigned staff. While the Port has a contract with Pasha Stevedoring for lines service, any stevedore may be used for other labor.

H. Water,  City rate + % Fee 7.50%

I. Security Fee - $895 per day (subject to change)

 

See Tariff for Rate Structure and Regulations